- importsource = "01624075-2011-06.txt"
- Artículo:
ACI Board Committee Members Thanked
- Resumen:
I cannot thank our ACI committee members enough for their service and assistance during my transition to the ACI Presidency after Dick Stehly’s sudden passing. To the following members who have ended terms on Standing Board Committees as of the ACI Spring 2011 Convention, I appreciate your efforts and dedication
- Página:
20
- Publicación:
Concrete International
- Volúmen:
33
- Número:
6
- Periodo:
Junio 2011
- ISSN:
01624075
- SrcID:
01624075-2011-06.txt
- Documento número 986794
- Actualizado el martes, 10 de julio de 2018 11:06:04 a. m.
- Creado el martes, 10 de julio de 2018 11:06:04 a. m.
- Enlace directo
- Artículo:
Technical Committee Chairs Appointed
- Resumen:
Before the ACI Spring 2011 Convention in Tampa, FL, the ACI Technical Activities Committee selected 27 Chairs for ACI technical committees. These actions became effective after the recent convention
- Página:
22
- Publicación:
Concrete International
- Volúmen:
33
- Número:
6
- Periodo:
Junio 2011
- ISSN:
01624075
- SrcID:
01624075-2011-06.txt
- Documento número 986795
- Actualizado el martes, 10 de julio de 2018 11:06:04 a. m.
- Creado el martes, 10 de julio de 2018 11:06:04 a. m.
- Enlace directo
- Artículo:
How to Develop Better Project Specifications
- Resumen:
One of the most important tools for a successful project is a clear, concise, accurate specification that is written so that it cannot be misunderstood. Guidance is provided for proper use of “Specifications for Structural Concrete (ACI 301-10)” and other specification reference documents. Specific recommendations include using only those reference documents that are written in mandatory language and provide specific instructions to the contractor
- Página:
41
- Publicación:
Concrete International
- Volúmen:
33
- Número:
6
- Periodo:
Junio 2011
- ISSN:
01624075
- SrcID:
01624075-2011-06.txt
- Documento número 986796
- Actualizado el martes, 10 de julio de 2018 11:06:04 a. m.
- Creado el martes, 10 de julio de 2018 11:06:04 a. m.
- Enlace directo
- Artículo:
Performance-Based Requirements for Concrete
- Resumen:
This is the second in a series of three articles dealing with performance-based requirements for concrete. This article summarizes the content of the report, ITG-8R-10, prepared by Innovation Task Group 8. Examples of the topics covered in the report, which is the first ACI document devoted to the subject of performance-based requirements for concrete, are provided
- Página:
47
- Publicación:
Concrete International
- Volúmen:
33
- Número:
6
- Periodo:
Junio 2011
- ISSN:
01624075
- SrcID:
01624075-2011-06.txt
- Documento número 986797
- Actualizado el martes, 10 de julio de 2018 11:06:04 a. m.
- Creado el martes, 10 de julio de 2018 11:06:04 a. m.
- Enlace directo
- Artículo:
Battered Concrete Retaining Walls
- Resumen:
A concrete retaining wall stem is usually battered to reduce the concrete dead load on the footing. The placement of the vertical dowel bars and the vertical reinforcing bars is dependent on the retaining wall configuration—sloped, stepped, and/or uniform top wall thickness. When the wall batter is factored into the geometry, the reinforcing bar location is not straightforward and should be detailed appropriately on the drawings
- Página:
53
- Publicación:
Concrete International
- Volúmen:
33
- Número:
6
- Periodo:
Junio 2011
- ISSN:
01624075
- SrcID:
01624075-2011-06.txt
- Documento número 986798
- Actualizado el martes, 10 de julio de 2018 11:06:04 a. m.
- Creado el martes, 10 de julio de 2018 11:06:04 a. m.
- Enlace directo