1. importsource = "01624075-2007-03.txt"
Se encontraron 76 resultados.
Artículo:

For the Trump Tower construction in Las Vegas, NV, the floor-a-day schedule was met using a detachable pumping boom that could be attached to one of the two climbing towers. For some placements, most of the concrete was pumped from one tower, and the rest was placed using crane-and-bucket.

Autor:

Steve Heimark

Página:

34

Publicación:

Concrete International

Volúmen:

29

Número:

3

Periodo:

Marzo 2007

ISSN:

01624075

SrcID:

01624075-2007-03.txt

  • Documento número 95419
  • Actualizado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Creado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Enlace directo
Artículo:

Workability of No-Slump Concrete

Autor:

Aulis Kappi

Erik Nordenswan

Resumen:

While there are potentially applicable methods to quantitatively measure the workability of fresh no-slump concrete, they’re not widely used in the precast industry.

Página:

37

Publicación:

Concrete International

Volúmen:

29

Número:

3

Periodo:

Marzo 2007

ISSN:

01624075

SrcID:

01624075-2007-03.txt

  • Documento número 95420
  • Actualizado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Creado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Enlace directo
Artículo:

D.C. Feels the Heat

Autor:

Jennifer Thompson

Resumen:

When construction delays on a bridge to replace the Woodrow Wilson Bridge in Washington, DC, forced the placement of concrete during the winter, the contractor chose to use hydronic heaters for curing rather than traditional tarping and heating.

Página:

42

Publicación:

Concrete International

Volúmen:

29

Número:

3

Periodo:

Marzo 2007

ISSN:

01624075

SrcID:

01624075-2007-03.txt

  • Documento número 95421
  • Actualizado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Creado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Enlace directo
Artículo:

Glass Fiber-Reinforced Latex Modified Concrete

Autor:

Mohsen A. Issa

Mohammad A. Alhassan

Jill C. Ramos

Resumen:

For field installation of latex modified concrete (LMC) overlay, mobile mixers are required due to the short allowable working time.

Página:

48

Publicación:

Concrete International

Volúmen:

29

Número:

3

Periodo:

Marzo 2007

ISSN:

01624075

SrcID:

01624075-2007-03.txt

  • Documento número 95422
  • Actualizado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Creado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Enlace directo
Artículo:

New ACI Fellows to be Honored at Spring Convention

Página:

24

Publicación:

Concrete International

Volúmen:

29

Número:

3

Periodo:

Marzo 2007

ISSN:

01624075

SrcID:

01624075-2007-03.txt

  • Documento número 95423
  • Actualizado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Creado el martes, 23 de mayo de 2017 03:38:20 p. m.
  • Enlace directo