- Artículo:
The Concrete Test Report
- Resumen:
Probably the most common report in the concrete industry is the concrete test report. Typically, a report is sent when a 7-day break is completed. Later, the same report is updated and resent with the 28-day test results. The concrete test report serves one basic purpose: to assure those involved with a project that the right concrete was delivered to the job site. While the format of test reports can vary from one testing laboratory to the next, each will contain the information needed to determine whether the concrete meets the job-site requirements.
- Página:
41
- Publicación:
Concrete International
- Volúmen:
32
- Número:
12
- Periodo:
Diciembre 2010
- ISSN:
01624075
- SrcID:
01624075-2010-12.txt
- Documento número 986739
- Actualizado el martes, 10 de julio de 2018 11:06:03 a. m.
- Creado el martes, 10 de julio de 2018 11:06:03 a. m.
- Enlace directo
- Artículo:
Omnilife Soccer Stadium for Guadalajara’s Chivas
- Resumen:
The Omnilife Stadium in Guadalajara, Mexico, evokes the image of a “volcano with a cloud” rising from the countryside. The revised design for the project maintained the overall architectural concept and incorporated significant changes that allowed dramatic cost reductions. Sloped slabs were used in place of berms for the volcano and eliminated the need for massive retaining walls. Footings were used throughout the structure. Macrocolumns supporting the roof are incorporated into the supporting structure for the sloped slabs and provide support for the upper seating areas. The sloped walls form a cone that resists seismic effects. The sloped walls and raker beams and columns work together with the macro-columns to resist overturning moments from the large roof cantilever.
- Página:
45
- Publicación:
Concrete International
- Volúmen:
32
- Número:
12
- Periodo:
Diciembre 2010
- ISSN:
01624075
- SrcID:
01624075-2010-12.txt
- Documento número 986740
- Actualizado el martes, 10 de julio de 2018 11:06:03 a. m.
- Creado el martes, 10 de julio de 2018 11:06:03 a. m.
- Enlace directo
- Artículo:
Bar Detailing at Wall Openings
- Resumen:
Any building is going to have openings in walls or structural slabs, and openings can interrupt reinforcing bar curtains. Design and detailing requirements at an opening perimeter are provided, including the minimum required reinforcing and reinforcing needed to replace interrupted bars. Problems associated with commonly used details show that designers should be cautious of generic notes for trim bars around openings. Careful assessment of the opening size, location, bar spacing, and development may show that special details are required.
- Página:
52
- Publicación:
Concrete International
- Volúmen:
32
- Número:
12
- Periodo:
Diciembre 2010
- ISSN:
01624075
- SrcID:
01624075-2010-12.txt
- Documento número 986741
- Actualizado el martes, 10 de julio de 2018 11:06:03 a. m.
- Creado el martes, 10 de julio de 2018 11:06:03 a. m.
- Enlace directo
- Artículo:
2011 Tilt-Up Concrete Achievement Awards
- Resumen:
Now in its 20th consecutive year, the Achievement Awards program of the Tilt-Up Concrete Association (TCA) was established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology, and provide unique solutions to building programs.
- Página:
58
- Publicación:
Concrete International
- Volúmen:
32
- Número:
12
- Periodo:
Diciembre 2010
- ISSN:
01624075
- SrcID:
01624075-2010-12.txt
- Documento número 986742
- Actualizado el martes, 10 de julio de 2018 11:06:03 a. m.
- Creado el martes, 10 de julio de 2018 11:06:03 a. m.
- Enlace directo
- Artículo:
The Effect of Curling on Floor Flatness
- Resumen:
ACI 117-06 and ACI 117-10, “Specification for Tolerances for Concrete Construction and Materials,” require F-numbers to be measured within 72 hours after slab concrete placement.
- Página:
76
- Publicación:
Concrete International
- Volúmen:
32
- Número:
12
- Periodo:
Diciembre 2010
- ISSN:
01624075
- SrcID:
01624075-2010-12.txt
- Documento número 986743
- Actualizado el martes, 10 de julio de 2018 11:06:03 a. m.
- Creado el martes, 10 de julio de 2018 11:06:03 a. m.
- Enlace directo